HEBEI BAIKE · ENGINEERING & EQUIPMENT

Gas isolation

Three-point electric goggle valves

Mechanical line isolation using a switching blind and open section.

  • Confirm the required gas-line isolation and switching sequence.
  • Coordinate release, travel and clamping functions.
  • Specify actuator power, position feedback and maintenance clearance.
Request a specification ← Back to product range

EQUIPMENT OVERVIEW

Built around
the operating duty.

Mechanical line isolation using a switching blind and open section.

Confirm the medium, pressure, temperature, operating frequency and required sealing duty for the proposed installation.

Materials, actuator, connections, dimensions, inspection requirements and acceptance criteria are agreed for the selected equipment. Send an existing data sheet or drawing with your enquiry where available.

RELATED EQUIPMENT

Explore the range.

All products

LET’S TALK ABOUT YOUR PROJECT

Start with your process.
We’ll discuss the equipment.

Send an enquiry
Image
Full equipment view